Slope stabilisation works on high-speed railway line 050
Summary
ADIF-AV is procuring railway cutting slope stabilisation works in Arándiga, Zaragoza province, along high-speed line 050 between Madrid, Zaragoza, Barcelona and the French border. The works cover three sections: chainages 242+231–243+120 on both tracks and 244+630–244+991 on track 1. They include clearing and removing loose material, installing galvanised steel guiding mesh, constructing drainage channels, and strengthening the foundation of a communications tower and adjacent building. The works are procured as a single lot and are expected to take five months.