Tender detail
Works to remedy defects at eleven infant and primary education centres in Málaga
Summary
The tender covers construction works to remedy defects at 11 public infant and primary education buildings in Málaga, based on the approved project. The schools are Lex Flavia Malacitana, Gutiérrez Mata, Miraflores de los Ángeles, Luis Braille, Luis de Góngora, Virgen de Belén, José María Hinojosa, Vicente Aleixandre, Constitución 1978, Hogarsol and Cayetano Bolívar. The schools will remain in use during the works, so affected areas must be taken out of use only for the minimum time necessary. The works must be completed within 3 months from the working day following signature of the site-setting-out verification record; the period cannot be extended. The contract is not divided into lots. The estimated value is €424,023.10 excluding VAT, and the maximum budget is €513,067.95 including 21% VAT. Price is worth up to 80 points. The existing works warranty is 2 years; an extension of 6 or 12 months can earn up to 20 points under the warranty-extension criterion. Bidders must meet the required company registration, works classification, turnover and comparable-experience requirements, and appoint a suitably university-qualified works manager. Before contract formalisation, the successful bidder must prove access to a materials depot exceeding 50 m² in Málaga or within 20 km of the city. During performance, at least three vehicles with an eligible environmental rating must be used, and the contractor must comply with occupational safety, environmental and construction-waste management requirements.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.