Tender detail
Renewal of the Main Low-Voltage Switchgear and Control Systems at Schramberg Wastewater Treatment Plant, Phase 1
Summary
The City of Schramberg is procuring electrical, instrumentation, control and automation works for Phase 1 of the conversion of its wastewater treatment plant. The scope includes a new main low-voltage switchgear installation and switchgear room, power and data cabling, connections to existing plant equipment, automation and process-control system adaptations, a mobile-generator connection point, climate control, lighting, safety equipment, testing and commissioning. Work must be coordinated with the treatment plant in operation.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.