Hydraulic Works for the Modernisation of Puchheim Water Treatment Plant
Summary
Zweckverband zur Wasserversorgung der Ampergruppe is modernising the Puchheim water treatment plant, which will treat 250 litres per second using iron and manganese removal, six filter groups and two UV systems while remaining in operation. The hydraulic works include dismantling the existing installation, maintaining temporary operation, and supplying and installing a ready-to-operate plant with stainless-steel piping, equipment, fittings, pipe supports and operating platforms inside the existing building. Site induction is scheduled for 15 February 2027, construction is to begin on 28 June 2027, and the works are to be completed by May 2029.