Tender detail
1st construction phase Sülzenbrücken East
Summary
The tender concerns the Ortsentwässerung project for the Sülzenbrücken area. The objective is to establish a separated sewerage system and to install new wastewater and stormwater networks, a wastewater pumping station, and a pressurized wastewater line from Sülzenbrücken to Thörey, with a connection to the Deponie Rehestädt. Drinking water pipelines and related infrastructure are included, and the works are planned in three construction phases. The project aims to reduce pollution in the Weidbach and improve environmental management in the area. Details, requirements and award criteria will be specified in the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.