Tender detail
Repair of the Piesport Moselle Bridge
Summary
The Landesbetrieb Mobilität Trier is procuring repair works for the Moselle bridge on the L 50 in Piesport, which connects the town’s two districts. The works include renewing the bridge deck and adjoining road surfaces, partially replacing both expansion-joint assemblies, repairing concrete and coatings, adjusting paving and kerbs, and cleaning and inspecting the bridge drainage. The bridge is approximately 181 m long and covers about 1,720 m²; the planned execution period is no more than eight weeks between March and May 2027.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.