Tender detail
Drinking-water pipeline installation and sewer rehabilitation in Schmiedeberg, Dippoldiswalde
Summary
The procurement covers two construction lots at Schmiedeberger Markt 4 in Dippoldiswalde. The first involves replacing approximately 170 m of drinking-water pipeline, including about 115 m using pipe relining. The second covers sewer and road works: partial renewal of one DN 200 sewer section and three DN 150 PVC connection sections, sealing three connection-pipe ends, replacing two manhole covers, and reinstating affected surfaces. Both lots are scheduled for work from 19 April to 30 September 2027.