Tender detail
Tender and construction design for the A14 Frastanz–Nenzing general refurbishment
Summary
ASFINAG is procuring planning services for the general refurbishment of the A14 between Frastanz and Nenzing, covering kilometres 45.60 to 50.7. The project includes refurbishment of bridges W6, W7/8, W9 and W13; replacement of noise barriers between kilometres 47.5 and 49.9; works to the open-road areas and Nenzing interchange ramps; rehabilitation of the drainage system; and construction of a new water protection facility. The planning concerns works scheduled for 2029–2030 and is procured as one lot.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.