Tender detail
Construction of the Mořice biogas and biomethane plant
Summary
A new biogas and biomethane plant, including a gas pipeline, is to be delivered as a turnkey project at the agricultural production site in Mořice. The works include design, supply and installation of buildings and equipment, connection to existing infrastructure, commissioning and testing, staff training, and handover of operating and technical documentation. The plant will generate electricity and heat through combined heat and power generation and upgrade biogas to biomethane for injection into the distribution network; the planned construction period starts on 31 May 2027 and lasts 15 months.