Construction of the Wałowice transit water supply network and replacement of the network in Dzikowo, Gubin Municipality
Summary
The Wałowice transit water supply network construction and Dzikowo network replacement tender concerns the preparation of complete project documentation and obtaining a building permit. The contractor must produce topographic surveys, the technical design and a detailed cost estimate, perform a feasibility study, and secure all necessary approvals. It requires coordination with authorities such as PKP PLK, Lasy Państwowe, GDDKiA, Zarząd Dróg Wojewódzkich, PSSE Sanepid, Wody Polskie, and Regional Environmental Directorate, ensure BIOZ and fire safety, and deliver documentation electronically. The contract duration is up to 5 months from contract signing, with a completion target of 15 March 2027.