Tender detail
Otomin – Sidewalk construction with drainage on Konna Street – Stage I
Summary
The tender concerns the construction of a 0.435 km sidewalk with road lighting on Konna Street in Otomin, including demolition of existing surfaces, concrete paving for the pedestrian route, driveways and gate accesses, concrete kerbs and edging, low greenery, drainage-related works and street lighting. The works must be completed within 2 months of contract signature and submitted electronically by 29 September 2026 at 09:00. Offers are evaluated by price, weighted at 60%, and the warranty period, weighted at 40%. The minimum warranty period is 36 months. No bid guarantee is required, but the successful bidder must provide a performance guarantee equal to 5% of the gross contract price. The works must be carried out in accordance with the design documentation, technical specifications, applicable standards and the tender documents.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.