Tender detail
Construction of a bicycle path on Podgórna Street in Stęszew and Witobel
Summary
The tender concerns the construction of a bicycle path on Podgórna Street in Stęszew and Witobel. The works must be carried out in accordance with the tender documents, the design documentation and the bill of quantities, and completed within 70 days. The contractor must prepare as-built documentation in two Polish-language copies, provide certificates for materials and operating instructions, and prepare the acceptance, measurement and inspection records. The tender must be submitted electronically in Polish by 25 September 2026. A tender guarantee of PLN 5,000 is required. Tenders will be evaluated on price (60%) and the warranty period for the construction works and installed equipment or materials (40%); the minimum warranty period is 36 months.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.