Tender detail
Adaptation of existing vertical road signs to the current permanent traffic organisation design on regional road No. 593 from km 46+361 to km 77+948
Summary
The contract covers adapting existing vertical road signs to the current permanent traffic organisation design along regional road No. 593 between km 46+361 and km 77+948. The works must comply with the permanent traffic organisation design, the technical specifications and the bill of quantities. The contractor must provide the necessary personnel, tools and technical equipment, prepare and obtain approvals for a temporary traffic organisation design before starting works in the road reserve, remove and dispose of unsuitable demolition materials at its own expense, and transport reusable materials to a location designated by the contracting authority within 40 km. The contract period is 63 days, with a declared completion period between 7 and 9 weeks. Price carries 60% and completion time 40% of the evaluation. Offers must be submitted electronically in Polish by 17 September 2026 at 09:00.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.