Tender detail

Comprehensive design and construction of power connections and emergency power supply systems for the Municipal Wastewater Treatment Plant in Rypin

Summary

The contract covers a design-and-build project for the Municipal Wastewater Treatment Plant in Rypin. The contractor must prepare complete multidisciplinary design and cost documentation, obtain the required connection conditions, approvals and permits, carry out the construction works, and supply and install the emergency power equipment. The works include transformer-station reconstruction, automatic reserve switching equipment, a generator foundation and fuel-tank infrastructure, internal power lines, site hardening, generator installation, testing and commissioning. The maximum completion period is 80 days from contract signature, with a minimum offered period of 70 days eligible for evaluation. Offers are submitted electronically by 15 September 2026 at 10:00. Evaluation is based on price (60%), completion period (20%) and warranty period (20%).

Reference number
2026/BZP 00412638/01
Buyer
GMINA MIASTA RYPIN
Country
Poland (POL)
Procedure
Basic procedure
CPV
45000000 Construction work
Deadline
2026-09-15
Status
Open
Contract subject
Works
Estimated value
Not published
Source
POL_BZP

More tender information after sign-in

The public view shows key tender details. Sign in to open official links, documents and AI tender support.