Tender detail
Construction of an emergency water intake for SP ZOZ in Międzyrzec Podlaski with a water treatment plant, technical infrastructure and connection to the hospital’s internal water supply system
Summary
The tender concerns the construction of an emergency water intake for SP ZOZ in Międzyrzec Podlaski, including a containerised water treatment plant, technical infrastructure, connection to the hospital’s internal water supply system, well drilling, installation and commissioning of water intake equipment. The works must be completed within 70 days of contract signing. The tender is submitted electronically in Polish by 15 September 2026 at 11:00. Evaluation is based on gross price (60%) and additional warranty period (40%); the standard warranty periods are 60 months for construction works and 24 months for supplied and installed materials and equipment, with up to 20 additional months receiving points.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.