Tender detail
Demolition of the old Czarnieckiego footbridge and construction of a new footbridge
Summary
The contract covers demolition of the existing wooden pedestrian footbridge over the Drawa River on the Czarnieckiego trail and construction of a new pedestrian footbridge in Drawieński National Park, Barnimie, Drawno municipality. The works include demolition, foundations on four Ø400 mm piles under each abutment, reinforced-concrete abutments, a steel load-bearing structure, wooden decking and railings, earthworks, bank protection and site restoration. The maximum completion period is 50 days from signing the contract, with 47-day and 45-day options receiving additional evaluation points. Offers must be submitted electronically in Polish by 15 September 2026 at 08:30. A PLN 9,000 tender guarantee, a mandatory site visit and a 5% performance guarantee are required. The price carries 60% of the evaluation weight and the completion period 40%.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.