Tender detail
Dredging sediment from water reservoir bottoms and repairing slope, reservoir bottom and ditch reinforcements in Central Park, Bydgoszcz
Summary
The contract covers construction works in Central Park in Bydgoszcz: dredging sediment from the bottoms of water reservoirs and repairing the reinforcement of slopes, reservoir bottoms and a ditch. The works must be completed within 70 days. Tenders must be submitted electronically in Polish by 14 September 2026 at 00:00 via the designated procurement platform and signed with an accepted electronic signature. The evaluation is based on price (60%) and the warranty liability period (40%). No bid guarantee is required, but performance security is required.