Tender detail
Modernisation of Sadowa Street in Serock
Summary
The tender concerns the repair and modernisation of a section of Sadowa Street in Serock. The works include, among other things, removing the existing road surface and soil, constructing the road base and bituminous pavement, installing kerbs, drainage facilities, renovating a roadside ditch, constructing concrete-paver driveways, adjusting the levels of utility infrastructure and street lighting, and installing traffic-management measures. The expected completion period is 45 days, and the tender must be submitted electronically by 10 September 2026 at 11:30. Tenders will be evaluated on price (70%) and the warranty period for the entire scope of works (30%). The successful bidder must submit a detailed cost estimate before signing the contract and a detailed work and financial schedule within seven days of signing the contract.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.