Tender detail
Comprehensive energy-efficiency modernization of the building at 4 Reymonta Street, Dobrzeń Wielki under a design-and-build model
Summary
The contract covers the design and construction of a comprehensive energy-efficiency modernization of the municipal building at 4 Reymonta Street in Dobrzeń Wielki. The contractor must prepare the full design documentation and obtain the required approvals, then carry out thermal insulation, heating and electrical-system upgrades, an air-to-water heat pump, energy-management automation, photovoltaic panels with energy storage, accessibility improvements, drainage and site works, testing, commissioning and as-built documentation. The works will be performed in an occupied building and must be phased to maintain user safety and agreed operational continuity. The contract term is 8 months, bids are due by 9 September 2026, and the evaluation criteria are price (60 points) and warranty period (40 points). A PLN 20,000 bid guarantee is required.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.