Tender detail
Reconstruction of the pedestrian and cycle bridge in Głuchołazy under a design-and-build arrangement
Summary
The contract covers the design and reconstruction of the pedestrian and cycle bridge known as the “Swinging Bridge” in Głuchołazy, damaged by flooding in September 2024. The contractor must prepare multidisciplinary design documentation, demolish the damaged steel structure, reconstruct the bridge and related infrastructure, and provide author’s supervision. The contract period is 15 months, offers must be submitted electronically in Polish by 7 September 2026, and tenders will be evaluated by price (60%) and the length of the quality guarantee (40%).
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.