Tender detail
Construction of a storage hall for civil protection and civil defence – Stage I – demolition of the utility shelter
Summary
The tender concerns demolition works as the first stage of preparing the site for a future storage hall for civil protection and civil defence. The contractor must demolish the utility shelter down to level 0.00, without removing the floor slab or foundation footings, clear and level the site, dispose of waste, prepare as-built geodetic documentation, and provide a construction manager with the required construction licence. The contract is awarded on the basis of price and completion time, with a maximum execution period of 30 calendar days.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.