Tender detail
Geophysical Survey of Wind Farm Search Area 6/7
Summary
Open procedure for offshore geophysical surveys in Wind Farm Search Area 6/7 in the Dutch North Sea. The work is divided into two lots: Lot 1 for seabed surveying and Lot 2 for 3D ultra-high-resolution seismic surveying. Offshore surveys are planned for 2027, with processing and interpretation expected to be completed in 2028; the planned contract period is 24 months. The tenderer may submit for and receive both lots, with a maximum of two lots submitted and awarded. Electronic submission is required by 7 December 2026 at 13:00. Evaluation covers preliminary project documentation, the project team, vessels and equipment, and prices and rates. The available award weights are 45%, 15%, 15% and 25% for Lot 1, and 45%, 15%, 20% and 20% for Lot 2, respectively.