Replacement of the crane control equipment and speed variation system for the overhead crane 460 t / 20 t – 23.20 m reach at the heavy cargo terminal
Summary
The tender concerns the replacement of the overhead crane control equipment and speed variation system: removal and disposal of the existing speed variation and control equipment; supply of a new speed variation and control motor assembly and mechanical integration into the existing electrical cabinets; complete electrical connections; configuration, commissioning, checks of proper operation and tests, first in no-load and then under load; provision of technical documentation, training for operations and maintenance staff, and guarantee of proper operation of the renovated installation.