Tender detail
Construction of Cell 7 at the Launay-Lantic Non-Hazardous Waste Landfill
Summary
KERVAL Centre Armor is procuring construction works for Cell 7 at the Launay-Lantic non-hazardous waste landfill in Lantic. The two lots cover earthworks and the passive safety barrier, including a required supplementary option to supply 9,000 m³ of clay materials, and a geomembrane sealing system, including approximately 5,690 m² of lining at the base and 7,340 m² on the slopes. The works also include groundwater drainage, leachate collection and drainage, stormwater management, and related access and site works.