Tender detail
Construction of a photovoltaic canopy with rainwater harvesting at Morne Desaix
Summary
The French Ministry of the Armed Forces, through the Fort-de-France Defence Infrastructure Directorate, is procuring construction of a photovoltaic canopy at Morne Desaix in Fort-de-France. The single, unallotted works contract covers a 43.2 kWp solar installation, electrical systems and remote monitoring, EV charging infrastructure, civil engineering and a rainwater collection system with a 3,000-litre tank. The work period is five months, preceded by a three-month preparation period.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.