Tender detail
Supply of a Submerged Production Pump for the Villetaneuse Geothermal Well
Summary
The SMIREC energy network authority is procuring a submerged electric production pump for the geothermal production well in Villetaneuse. The contract runs for 48 months, is not divided into lots and includes two optional tranches: a pressure sensor installed beneath the motor with a surface signal-processing module, and an electrical connection box between the premises and the wellhead.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.