Renewal of the Upalinko 110 kV substation
Summary
Turku Energia Sähköverkot Oy is procuring the renewal of the Upalinko 110 kV substation in Turku as a turnkey construction contract. The scope includes design and construction of a new two-storey substation building, a new SF6-free double-bus GIS switchgear with control, protection, automation and auxiliary power systems, 110 kV cable connections, and demolition of the existing outdoor switchgear and substation building. The new substation is targeted to enter service by 1 December 2029, with demolition works to be completed by 1 June 2030.