Tender detail
Elevated section for a floating bridge
Summary
The tender concerns construction of an elevated section for an existing floating bridge and shortening the bridge as part of those works. The works must be completed during 2026. The tender must include provision for lighting and its electrical supply, two technical maintenance and warranty repair visits in spring 2027 and spring 2028, and relocation of the pontoons being replaced to a location in Loviisa Bay designated by the contracting authority. The submission deadline is 1 October 2026.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.