Tender detail
Design and track renewal works on Metro Line 5 between Verdaguer and Camp de l’Arpa
Summary
Ferrocarril Metropolità de Barcelona is procuring the design and works for renewal of Metro Line 5 track between Verdaguer and Camp de l’Arpa, with no division into lots. The scope covers approximately 8.52 km of track-related works, including conversion of ballasted track to slab track, renewal and installation of track switches at Sagrada Família and Verdaguer, and associated drainage, rail welding, catenary adjustments, ventilation and service-closure works. The works are expected to take approximately seven months; the contract term is two years. The tender budget is €18,391,999.65 including VAT.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.