Tender detail
Construction of a sports department warehouse at Joaquín Blume Sports City
Summary
The Municipality of Torrejón de Ardoz is procuring the construction of a single-storey warehouse for sports equipment and maintenance materials at Joaquín Blume Sports City. The works include foundations, concrete-block walls, a metal roof with insulated sandwich panels, flooring, doors, basic electrical, water and drainage installations, ventilation, fire protection, health and safety measures, and construction-waste management. The contract is not divided into lots; its budget is €189,999.84 including VAT, and the maximum completion period is three months from the works layout record.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.