Installation of climate control and adaptation of toilets at the Capilla del Oidor
Summary
The City of Alcalá de Henares is procuring climate-control installation and toilet adaptation works at the Capilla del Oidor and adjacent grounds, together with construction supervision and health and safety coordination services. Lot 1 covers installing climate control, removing obsolete equipment, creating an accessible public toilet and a staff toilet, and integrating the external units appropriately into the streetscape. Lot 2 covers works supervision and occupational health and safety coordination. The total budget is EUR 307,167.70 including VAT, and the works must be completed within a maximum of four months.