Tender detail
Repair of the fountain and water reservoir at Chorros Square
Summary
The tender covers the repair, strengthening and waterproofing of the fountain at Chorros Square in Polop de la Marina and its underground water reservoir. The works include ground improvement by injecting expanding resin, repair and reconstruction of damaged structural elements, crack repairs, reinforcement treatment, and waterproofing of pipes and the reservoir. The reservoir must be drained and returned to service in coordination with the irrigation community, while minimizing disruption to irrigation water. The works are to be completed within three months. The estimated contract value is €145,984 excluding VAT, and the maximum budget is €176,640.64 including VAT. Bids must be submitted electronically, and the price must not exceed the budget ceiling. The 100-point evaluation covers the technical work memorandum (25), price (35), quality and occupational-safety management certificates (5), vehicle environmental rating (10), a shorter completion period (10), an extended warranty (5), and the relevant experience of the works manager (10). The technical memorandum may not exceed 30 pages. The contractor must provide safety arrangements, quality control, waste management and the required reservoir watertightness tests, and prepare a health and safety plan for approval before work begins. Bidders must meet the stated financial and technical capacity requirements. Annual turnover must be at least €218,976. Technical experience must include works carried out on protected monuments or historic buildings during the last five years, with a value of at least €218,976 in the year of greatest activity. Bidders must also provide the required declarations on eligibility and exclusion grounds, together with evidence of turnover and experience.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.