Tender detail
Photovoltaic systems procurement
Summary
The tender concerns the installation of photovoltaic systems on four existing buildings in Bremerhaven for self-consumption. The planned systems should reduce external electricity consumption and complement the existing research infrastructure. The roofs and façades differ in terms of construction constraints, orientation, available space and the existing electrical infrastructure. The objective of the procurement is to obtain a technically optimized photovoltaic system solution for the existing buildings. Planning, design, supply, installation and commissioning services form a single comprehensive service per lot.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.