Tender detail
Cable route construction for the Regensburg Ost electronic interlocking – line 5500, km 130.883–137.660
Summary
At Regensburg Ost station, the works will construct an electronic interlocking system to replace five existing mechanical interlocking systems. The scope includes approximately 2.3 km of cable routing system size I, 4.4 km of size II, 1 km of size III and 2 km of size IV, together with cable crossings and chambers of various sizes; crossing pipes will be 5–50 metres long. The project also covers signalling and overhead-line equipment on several track sections and modifications to telecommunications and 50 Hz installations.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.