Tender detail
Framework agreement for meter replacement and installation – Lot 1: electricity, Lot 2: gas, Lot 3: water
Summary
Mainzer Netze GmbH is procuring the replacement and installation of electricity, gas and water meters in three lots. The electricity lot includes modern and smart meters and the recording and transmission of meter and replacement data; the gas and water lots include scheduled replacements and collection of sample meters for inspection. Each lot is covered by a separate framework agreement for four years, with extensions of up to two additional two-year periods. The stated maximum values are €8,006,640 for electricity, €1,154,880 for gas and €1,826,400 for water, excluding VAT.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.