Tender detail
Air Conditioning Equipment 2026–2029
Summary
Brno University Hospital is procuring the supply and installation of air-conditioning equipment over a 48-month period, to replace or supplement existing systems. The scope also includes removal and environmentally sound disposal of replaced equipment, testing and inspections, operator training, operating and maintenance instructions, connection to the hospital’s control system, and related building and electrical work.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.