SIDEN is procuring works in the municipality of Wincrange to build a 263 m³ stormwater basin and install a wastewater collector between Oberwampach and Schimpach. The contract is divided into two lots: civil engineering works and electromechanical equipment works. Both lots are scheduled to start in March 2027; the stated execution periods are 300 working days for Lot 1 and 200 working days for Lot 2.