Construction of photovoltaic power plants in Petržalka and Senica
Summary
The tender concerns the construction of two photovoltaic power plants at the Petržalka and Senica wastewater treatment facilities, divided into two lots: Lot 1 Petržalka – PV power plant construction (531.00 kWp) and Lot 2 Senica – PV power plant construction (425.70 kWp). Works include installation of PV panels on suitable roof areas, upgrading of the lightning protection system, development and integration of a remote dispatch and monitoring system, and preparation and delivery of complete project documentation including revisions, tests and protocols. The estimated total for Lot 1 is EUR 1,495,864.96 and for Lot 2 EUR 729,382.70. Financing is from ERDF 2021; the planned duration is 12 months per lot.