Tender detail
Air handling unit for ambient parameter control in the ELI-NP research infrastructure experimental buildings – 54 000 m3/h
Summary
The tender concerns the supply, installation and initial configuration of an air handling unit with a capacity of 54,000 m3/h for the experimental buildings of the ELI-NP research infrastructure. The equipment will enable ambient parameter control to ensure stable temperature and humidity and the required cleanliness level. The supplier must provide the relevant technical specifications and ensure quality, reliability and warranty terms.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.