Tender detail
Zemmer Wastewater Group Lot 3: Construction of the Storage Sewer, Retention Soil Filter and Rodt Connecting Sewer
Summary
The tender concerns construction works for Lot 3 of the Zemmer wastewater group, divided into two sub-lots. Sub-lot 1 covers the structural construction of a storage sewer, a retention soil filter and a connecting sewer between Rodt and Schleidweiler, including dismantling an existing stormwater overflow structure, connecting to the existing combined sewer network and constructing the related structures. Sub-lot 2 covers the mechanical and electrical works for the storage sewer and retention soil filter. Works must begin no later than 15 working days after receipt of the contract award letter. The submission deadline is 18 September 2026.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.