Tender detail
Conducting geothermal-specific flow-through tests to determine reservoir integrity limits
Summary
The tender concerns geothermal flow-through, or flooding, tests on sandstone from the North German Basin, including analysis before and after the tests, to determine the limits of reservoir integrity. The bidder must have a newly developed modular testing facility and be able to operate it properly under the operating parameters specified in the tender. The procurement covers the test data and results, not the purchase of the testing facility itself. Tenders must be submitted by 7 September 2026.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.