Expansion of the Wastewater Drainage Network in Presa and Valeirinha – Phase 1
Summary
ABMG – Águas do Baixo Mondego e Gândara is procuring construction works to extend the wastewater drainage network in Presa and Valeirinha, Phase 1. This is a single-lot contract with a 480-day execution period and a base price of EUR 1,018,885.57 excluding VAT. The project includes environmental measures such as reusing 6,861.96 m³ of excavated soil, representing 85.09% of the material covered by the waste-management plan, and a wastewater pumping station with automated and timed operation.