Installation of Electrical Infrastructure in PEZO and Santa Cruz
Summary
EEM – Empresa de Electricidade da Madeira is procuring construction works to install underground electrical infrastructure in PEZO and the Santa Cruz area of Madeira, including at Reis Magos, Pinheirinho-Eiras and Gaula. The works include approximately 2,264 metres of trenches and corrugated ducts for electrical cables, 25 reinforced-concrete inspection chambers, associated electrical installations and equipment, testing, and reinstatement of road surfaces and markings. The works have a maximum duration of 135 days and a base price of EUR 350,000 excluding VAT.