Tender detail
Detailed design of the Barosa, Ruivaqueira and Vale da Marinha irrigation blocks
Summary
The Lis Valley Irrigation and Beneficiaries Association is procuring preliminary studies and detailed design for the Barosa, Ruivaqueira and Vale da Marinha irrigation blocks in the Lis Valley agricultural water scheme. The scope includes two irrigation pumping stations (one also serving drainage), filtration, three weirs, two pressurised irrigation networks covering 369 ha and 373 ha, and a 5 ha gravity-fed network, together with topographical surveys and geotechnical investigations. The single, non-lotted services contract has a 270-day delivery period.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.