Tender detail
Fire-protection system renovation at the Pcim Social Welfare Home – fire alarm and stairwell smoke extraction systems, design and build
Summary
The Pcim Social Welfare Home is procuring the design and renovation of its fire-protection installations as a single, non-divided contract. The work includes upgrading the fire alarm system and renewing the control equipment for smoke extraction in two stairwells, integrating both systems, testing and commissioning them, providing as-built documentation, and training the facility’s staff. The minimum scope includes 109 fire-alarm installation points, including at least 88 detectors, 10 manual call points and 8 sounders, as well as two smoke-control panels and at least six smoke-ventilation buttons.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.