Design documentation for a treated-water reservoir at the Szczerbiecin water intake
Summary
Gmina Tczew is commissioning comprehensive multidisciplinary design documentation for expanding the water-treatment system at the Szczerbiecin water intake. The project includes a 200 m³ treated-water storage reservoir, a second-stage pumping station, underground connecting pipelines, modernisation of the water network between the treatment plant and deep wells, and control and automation systems. The contract also covers the related surveys, permits, construction and execution designs, cost estimates and specifications, as well as author’s supervision during construction. The documentation is due within 12 months of contract signature; the procurement is not divided into lots.