Tender detail
Construction of the Orlik 2025 Sports Complex with a Straight Running Track at Primary School No. 18 in Zielona Góra
Summary
The City of Zielona Góra, through Primary School No. 18, is procuring the design and construction of a single, integrated Orlik sports complex at the school. The works include a synthetic-turf football pitch, a polyurethane multi-use pitch, a straight running track, sanitary and changing facilities, lighting, fencing and ball-stop nets, site utilities and drainage, paths, sports equipment, bicycle stands and landscaping. The contractor will also prepare the design and obtain the required permits, complete the as-built documentation and obtain the occupancy permit. The construction is due to be completed by 31 August 2027, with the occupancy permit obtained by 20 October 2027; bids are not divided into lots.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.