Construction of a 150 m³ potable water storage tank at the Marzęcin groundwater intake
Summary
Wodociągi Pińczowskie is procuring construction of an additional above-ground potable-water storage tank with a capacity of 150 m³ at the Marzęcin groundwater intake. The works include the foundation, process pipelines, electrical and control installations, and integration of the tank’s control system with the buyer’s existing system. The contract is not divided into lots and is to be completed within 7 months of signing.