Tender detail
Modernisation of the local computer network (LAN)
Summary
Powiat Kolneński is modernising the LAN in its county office building in Kolno. The works include removing the existing network and installing cable routes, about 11,000 metres of horizontal copper cabling and a single-mode fibre backbone, together with distribution racks, RJ45 outlets, switches, Wi-Fi access points and an uninterruptible power supply. The contractor will configure and commission the equipment, test the network, restore affected finishes and provide as-built documentation. Completion is required within 120 days of signing the contract.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.