Tender detail
Upgrade of the playing area lighting at Polsat Plus Gdynia Arena
Summary
Gdynia Sports Centre is procuring the replacement of the existing lighting over the playing surface at Polsat Plus Gdynia Arena with a new energy-efficient LED lighting and control system. The work includes removing 110 existing metal-halide luminaires, supplying and installing the new system, electrical works, testing and commissioning, as-built documentation, and staff training. The system is intended to support basketball and handball events, including televised competitions.
More tender information after sign-in
The public view shows key tender details. Sign in to open official links, documents and AI tender support.